
Posted in
June 18/19: Track work on the City & Gold Coast line
Saturday 18th and Sunday 19th June 2022
Track work on the City and Gold Coast Line
All Airtrain services to and from the City and the Gold Coast will be affected by track work between Park Road and Yeerongpilly stations on Saturday 18th and Sunday 19th June 2022.
Travelling to the Airport
- All trains from the Gold Coast travelling to the Airport will depart and arrive 8 minutes later than the normal timetable for stations between Roma Street and the Domestic Airport.
- The train will run express (via the Tennyson Loop) between Altandi and Roma Street. If you are travelling from South Brisbane, South Bank, and Park Road stations catch the Shorncliffe train and transfer at Roma Street station to travel to the Airport.
Travelling from the Airport
- All trains departing from the Airport to the Gold Coast will arrive 5 minutes later than the normal timetable for stations between Altandi and Varsity Lakes.
- The train will run express (via the Tennyson Loop) between Roma Street and Altandi. Transfer to the Cleveland train at Roma Street for connections to South Brisbane, South Bank, and Park Road stations.
Delays of up to 60 minutes may be expected. Passengers travelling to or from the airport should allow extra travel time.
Find your station’s rail replacement bus stop location.
See https://translink.com.au/updates/108631 for more information.